This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
SRK contributed significantly to FI Joint Venture’s bankable feasibility study (BFS) for the Yogi magnetite project in Western Australia. The BFS outlined a large economic open pit with a 16-year mine life. SRK’s work included mineral resource exploration and estimation, geotechnical design, open pit optimisation, life of mine scheduling, and mining cost estimation. Additional tasks included designing a dry stack tailings storage facility, managing surface water and site water, and characterizing geochemical and asbestiform mineralogy. The BFS began in November 2020, with SRK completing its components by November 2021.
ESG is an evolving and vital field that has relevance in every aspect of mining today, and in which SRK has developed a depth of expertise over decades. SRK Consulting will be an active participant at the upcoming Southern African Institute of Mining and Metallurgy conference.
Learn MoreLandform evolution models (LEMs) are used to estimate potential surface water runoff and predict resulting erosion and deposition processes on a landform scale.
Learn More