This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
The project is part of the Sistema Riachuelo, the first major expansion of Buenos Aires’ main sewer system in over 70 years. It includes a bypass channel to divert effluents from the main collector to the emissary tunnel, bypassing the treatment plant during maintenance or emergencies. Located in a coastal area with fill material and Pampeano formations, SRK provided detailed structural and geotechnical engineering, covering support structures, foundations, and material specifications. Complex excavations required 2D and 3D geotechnical models. A study on thermal and rheological cracking in concrete was validated through a scaled model.
In 1964, Wright-Hargreaves mine closed after a seismic event (MN 3.1) caused a collapse, killing two miners. A larger MN 4.2 event followed, damaging 11 levels. The mine was permanently shut down on August 27.
Learn MoreAccording to Steve Bartels, partner and principal engineering technologist at SRK Consulting, hopes of a recovery in South Africa’s economic fortunes rely heavily on more infrastructure spending, but the COVID-19 pandemic is further complicating this difficult task.
Learn More