Africa: Geological Logging in Egypt

Between 2018 and 2022, SRK provided field services and technical consulting to the Abu Ghalaga titanium project in the Eastern Desert of Egypt. SRK’s initial involvement included geological mapping, a ground magnetic survey and the acquisition of a high-resolution satellite-derived digital elevation model. This work led to two phases of diamond drilling totalling 7,700 m in 35 holes, with SRK undertaking all geological logging and sampling, and management of all contractors and service providers. A mineral resource estimate was produced for the project, reported in compliance with the JORC Code (2012), which included indicated and inferred mineral resources.

By SRK Exploration Services