This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
Tailings storage facility (TSF) owners are facing the challenge of how to practically integrate social impacts with the systems that manage tailings – as required by the Global Industry Standard for Tailings Management (GISTM). Global engineers and scientists at SRK Consulting have proposed a four-step process to achieve this integration.
The steps cover four key aspects: knowledge sharing, training, and awareness; a critical review of systems for gaps and opportunities; upgrading of data systems to highlight targets and trigger action; and strategies for ongoing collaboration and development.
“The importance of social aspects in the GISTM is clear,” said SRK Consulting principal environmental consultant, Jacky Burke. “It appears as the very first topic in the 2020 publication of the standard, where mines are required to ‘meaningfully engage project-affected people at all phases of the (TSF) lifecycle’.”
Read the full article from African Mining
This study refines CPT-based shear wave velocity (𝑉𝑠) correlations for mine tailings by analyzing over 30 datasets, showing that saturation and microstructure significantly impact prediction accuracy, with Baldi et al. (1989) performing most reliably across conditions.
Learn MoreA leakage collection and recovery system (LCRS) for process water ponds and some tailings impoundments typically incorporates a two-layered synthetic liner with drainage media between the layers to drain and dissipate any leakage through primary liner, preventing leakage through
Learn More