Baynes Hydropower Plant 400kV Transmission Lines Project – Angolan ESIA

Short Project Title

Baynes Hydropower Plant 400kV Transmission Lines Project – Angolan ESIA

Project Title

Integration of the Proposed 860 MW Baynes Hydropower Project into the Angola and Namibia Power Systems: Environmental and Social Impact Assessment - Angola

SRK Project Reference Number

591191

EA Holder

N/A

Official Reference Number

MINAMB Protocol No. 20755756253

SRK Project Manager

Sharon Jones

Contact Person

SRK: Yakira Naina
Holísticos: Eduardo Ferdinand

Contact Email

ynaina@srk.co.za
holisticos@holisticos.co.ao

Contact Number

+27(0) 21 659 3060
+244 927 442 844

PROJECT SYNOPSIS

The governments of Angola and Namibia propose to build a large hydropower dam (known as the ‘Baynes Hydropower Project [(HPP]’) on the lower Kunene River to supply power to both countries.  An Environmental and Social Impact Assessment (ESIA) was undertaken in the 2010s and updated in 2024, but the dam has not yet been built. 

Rede Nacional de Transporte de Electricidade (RNT -  the National Electricity Transmission Grid, Public Company) and Namibia Power Corporation (NamPower), with support from the Southern African Power Pool (SAPP), propose to construct two 400 kilovolt (kV) high voltage transmission lines to transmit power generated at the Baynes HPP to a proposed substation at Cahama in Cunene Province, Angola and to the Kunene Substation in Omusati Region, Namibia. 

SRK Consulting (South Africa) (Pty) Ltd (SRK), together with sub-contractors Holísticos in Angola and Urban Dynamics in Namibia, has been appointed by SAPP to conduct two ESIAs (in Angola and Namibia respectively) for the transmission lines. 

Two corridors have been selected for the transmission lines. The Baynes - Cahama route in Angola is ~179 km long and the Baynes - Kunene route in Namibia is ~173 km long. The ESIAs will help identify the optimal line route within each corridor, assess environmental and social impacts of the line routes and recommend appropriate mitigation and management measures to manage those impacts.  

This website relates only to the ESIA process for the Angolan Baynes – Cahama transmission line route. 


PROJECT LOCATION

Namibe and Cunene Provinces, Angola 


STATUS OF PROJECT

The Scoping Report for the Baynes – Cahama transmission line in Angola was made available for public review and comment between 11 May 2026 and 11 June 2026. The Scoping Report was finalised following the comment period and will be submitted to the Ministério do Ambiente (MINAMB) in August 2026.  The Final Scoping Report and appendices are available below for information purposes. 

Stakeholders are still encouraged to register on the project database via the following link: https://www.holisticos.co.ao/index.php/pt/eventos-noticias/92-auscultacao-publica-baynes.  

The English Final Scoping Report is provided below, the Portuguese Final Scoping Report can be downloaded at the following link: https://www.holisticos.co.ao/index.php/pt/eventos-noticias/92-auscultacao-publica-baynes