Projects

Our experts have the multidisciplinary expertise, global knowledge, and operational experience needed to maximize your project's success. Search and contact our specialists who will satisfy your unique requirements.

To see more of our global projects, select a different language at the top of this page.

Optimization of Waste

Copper Mountain

Optimization of Waste

Optimization of Waste and Low-grade Ore
British Columbia, Canada

Interpreted monitoring data as part of the mine’s waste rock and tailings management plans.

Cerro Vanguardia Mine

TSF conceptual, feasibility and detailed engineering design, CQA and EOR services.WRD and HLP geochemical characterization

Cerro Vanguardia Mine

WRD and HLP geochemical characterization.
Santa Cruz, Argentina

Cerro Vanguardia is an Au-Ag mine that its operation consists of a series of longitudinal pits and underground operations following a gold vein, in the Argentinean province of Santa Cruz. A single Tailings Storage Facility (TSF) is currently under operation.

GISTM Conformance assessment and implementation support

Schwandorf GISTM

GISTM Conformance assessment and implementation support

GISTM Conformance assessment and implementation support
Germany

Hydro operates and maintains three bauxite residue facilities at the Schwandorf legacy site in the eastern part of Bavaria, Germany. The site holds residue from operations by German aluminium producer VAW in the period 1930s-1990s. The site became a part of Hydro with the acquisition of VAW in 2002.

Engineer of Record for Gruyere Joint Venture's Gold Mine

Engineer of Record for Gruyere Gold Mine

Engineer of Record for Gruyere Joint Venture's Gold Mine

Gruyere Gold Mine
Western Australia, Australia

SRK has been appointed as the Engineer of Record for the existing tailings storage facility at the Gruyere Gold Mine.

Bankable Feasibility Study

Yogi Bankable Feasibility Study

Bankable Feasibility Study

Yogi Magnetite Project Bankable Feasibility Study
Western Australia, Australia

SRK has provided ongoing support to FIJV for several years, which culminated in SRK completing several major components of the Yogi Bankable Feasibility Study during 2021.

Geotechnical Engineering of Four Tunnels

Mauro Tailings Dam Tunnels

Geotechnical Engineering of Four Tunnels

Geotechnical and Engineering Design
Chile

Produced designs, technical specifications, and cost estimates for 4 tunnels from 2.4 to 3.5 km long

Items per Page:
#Name#