From 2010 to 2015 SRK undertook the feasibility study, detailed design, and construction supervision of the Tap D in-pit tailings facility for the Tucano gold project in Brazil. After advising the client on the efficient operation of the facility to maximise in-pit tailings occupation, SRK designed and prepared construction documentation for the West Pond and the North Mill Pond above-ground tailings storage facilites. Both facilities are currently under construction, with SRK providing technical support to the site personnel and contractors responsible for construction.
SRK prepared a feasibility study update to assess the technical and economic feasibility of developing the Ghuzayn 3 copper deposit.
Interpreted monitoring data as part of the mine’s waste rock and tailings management plans.
Feasibility design for a filtered tailings storage facility.
Pilot study, feasibility study, and detailed design for a full-scale heap leach facility.
Under increasing pressure and incentives to reduce their carbon footprint, projects in the infrastructure and industrial space need to start early in their lifecycle to nd optimal mitigation and adaptation strategies.
Learn MoreSafer tailings storage facilities (TSFs) – or tailings dams – can be achieved when mine owners, contractors and engineering consultants work closely together, according to SRK Consulting senior geotechnical engineer Linda Spies.
Learn MorePT Newmont Nusa Tenggara plans to stockpile approximately 500Mt of copper ore for up to 20 years at the Batu Hijau mine on Sumbawa Island, Indonesia. Cu recovery from unoxidised ore is about 85%.