SRK Consulting (UK) Limited was engaged by Toro Gold Ltd to conduct a Pre-Feasibility Study (PFS) and subsequent Feasibility Study (FS) for the Mako Gold Project in Senegal. The studies focused on the hydrogeological and hydrological aspects of the Petewol open pit, integrated with geotechnical studies, to enhance the understanding of the site's groundwater and surface water systems to support both environmental management and operational planning.
The hydrogeological component of SRK’s work included the assessment of groundwater inflows into the open pit. During the PFS, analytical solutions were employed to estimate inflow rates, while the FS advanced these estimates using MODFLOW numerical groundwater flow modelling. Field investigations for the FS involved pumping tests, slug tests, and spinner tests to characterize aquifer properties and assess structural controls on groundwater flow. Additionally, SRK evaluated the cone of depression caused by dewatering and its potential impact on local water supply boreholes, as well as the formation of a pit lake post-closure.
On the hydrological side, SRK installed two river stage gauges to monitor surface water levels, trained on-site personnel in their operation, and conducted a walkover survey to identify potential locations for a water supply dam. The dam site assessment considered catchment characteristics, hydrological behavior, and construction requirements, ensuring its suitability to meet the project’s water needs. SRK also provided training for converting exploration core holes into sealed monitoring piezometers, which improved the reliability of groundwater monitoring data.
The work advanced Toro Gold’s understanding of the hydrogeological and hydrological systems, enabling informed decision-making for the project's environmental and operational planning. The Mako Project is currently operational.
SRK conducted a hydrogeological characterization of the Juanicipio mine to understand the origin and means of transport of the water that flows in the mining works, so that the mine could determine if the dewatering capacity currently installed is adequate or if it would be necessary to improve it to prevent a flooding event.
SRK developed a Dynamic Water Balance study for the Borborema Gold Project to refine water requirements.
Water supply well design completed for a project in the Sirhan-Turayf region of Saudi Arabia.
SRK has been involved in the Elk Creek project from helping locate drill holes to target resource infill areas through to acting as lead consultants for the multi-consultancy team that developed the 2017 feasibility study (FS).
South Africa is experiencing a warming trend that is about 1.5 times the global average. Kirsten Kelly talks to Mehmetcan Özkadıoğlu, hydrologist at SRK Consulting, about the impact of climate change on mine water management.
Learn MoreThe importance of groundwater supply has increased substantially over the past five years, as the impacts of global warming and associated droughts have been painfully felt across the country.
Learn MoreMining personnel have a different interpretation of the term “mine water management”.
Learn MoreXstrata undertook a feasibility study for a greenfield copper mine and related infrastructure in Sandaun and East Sepik Provinces, Papua New Guinea