Cut-off Grade

Author(s): 
Gary Poxleitner
Category: 
Mining

Abstract

Mining operations strategically look at maximizing profitability and cash flow to support a productive and safe mine, but often spend less time and effort on determining the preferred cut off grade that will form the basis of a sustainable mine. The Read more... about Cut-Off Grade Methodology and Best Practices

Author(s): 
Tim Lucks
Category: 
Geology

A presentation about optimising processing costs through the assessment of geological and mining cut-off grades, first presented at CRU 2017. Read more... about Optimising processing costs through the assessment of geological and mining cut-off grades

Author(s): 
Fraser McQueen
Category: 
Mining, Project Evaluation

A Strategic Mine Plan is the first stage of mine planning that sets the economic and technical direction for your project. The correct strategy is vital for the economic, social and environmental success of your project. You may be currently operating with a sub-optimal plan, so take this Read more... about 10 things you should know about Strategic Mine Planning for Open Pits

Subscribe to RSS - Cut-off Grade
SRK Worldwide