This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
SRK Consulting was appointed by Buffalo City Metropolitan Municipality to design and upgrade the Quinera Wastewater Treatment Works. The project consisted of two phases under which the first phase only included civil and building works and the second phase included the mechanical and electrical works. The upgrade required new inlet works, reactor, clarifier, WAS tank, and a dewatering works.
The computational mechanics team at SRK Argentina has successfully conducted numerical modeling to analyze the deformation of raceways during the cold bending process of service pipes.
The computational mechanics group, at SRK Argentina, undertook a vibration analysis focused on optimizing the performance during slewing operations of the portside crane of a FPSO (Floating Production Storage and Offloading) vessel located in the North Sea.
Work on the 140 km line included scheduling, quality monitoring, and environmental management
Construction of 66-point rotisserie milking dairy, including supporting services.
Eskom’s Koeberg nuclear power station was recently licensed to operate its Unit 1 for another 20 years, with SRK Consulting playing a role in updating the site investigation reports – the Site Safety Report (SSR) required by the National Nuclear Regulator (NNR).
Learn MoreIn this paper, a semi-analytical screening procedure makes use of the spectral properties of the seismic record, considering only the intensity of the frequency content which is not filtered by the dam to obtain an a priori estimate of demand (expressed as displacements).
Learn MoreWith the release of the Global Industry Standard on Tailings Management (GISTM) in August 2020, the foundation of this field has shifted, and the stakes have been raised.
Learn MoreAccording to Steve Bartels, partner and principal engineering technologist at SRK Consulting, hopes of a recovery in South Africa’s economic fortunes rely heavily on more infrastructure spending, but the COVID-19 pandemic is further complicating this difficult task.
Learn More