Re-engineering the Elkon Deposit

Elkon in South Yakutia, East Russia, is the world’s largest known, undeveloped uranium deposit. It occurs as a series of narrow sub-parallel, steeply-dipping veins located within the Yuzhnaya fault zone, covering a strike length of some 20km and extending from about 100m to 1600m below surface. On average, the veins are 2 to 3m thick but vary between 12m to <1m in thickness. Along the strike, the veins pinch and swell significantly over short distances.
The deposit was identified in the 1960, and explored extensively in the 1960s and ‘70s, with more than 2300 boreholes drilled and 52km of underground exploration workings completed.
The entire Yuzhnaya mineralized zone is located within an old Precambrian fault zone, though the rocks inside the zone were altered and deformed during several progressive tectonic events, which resulted in structural reactivation. Gold-uranium and molybdenum-uranium mineralization is associated with alkaline dikes displaying hydrothermal-metasomatic alteration. The principal uranium mineral is brannerite, (U4+,Ca)(Ti,Fe3+)2O6, which requires more aggressive leaching than most uranium minerals, so, with the development of the Priagunsky deposit, Elkon was not developed.
Atomredmetzoloto (ARMZ), the Russian state uranium mining company, engaged SRK to re-evaluate the deposit and to develop a plan that would meet the requirements of international funding and investment. Knowing that the need for narrow-vein underground mining methods and expensive processing methods would challenge the project economics, SRK aimed to develop a plan that could bring to bear the potential economies of scale and the fact that ore-sorting had been demonstrated to be effective.
SRK created a computerized geological model using the Soviet geological interpretations and borehole data. The model was used to determine the natural rate for different mining options and to identify the impact of different cut-off grades on resources. Taking into account the morphology of the deposit defined by the underground workings and the rock strength data, SRK concluded that a long-hole, open-stoping mining variant, combined with unconsolidated back-filling with development waste, is likely to be the most appropriate solution.
SRK drew heavily on the existing test-work to recommend a base case of pressurised acid leaching for the initial project feasibility analysis and identified a number of additional tests, which will be completed during the summer of 2009, to assess whether the flow sheet can be optimized.
With all of the data in Russian and often available only as hard copies, SRK created a team of Russian and UK employees and associates and worked closely with the client’s own specialists and Russian design institutes to update the options and to re-engineer the operation to significantly reduce the overall costs-per-pound of U3O8 from previous studies. The studies are ongoing with further data collection and test-work scheduled for 2009 and a Feasibility Study to begin in September.
David Pearce: dpearce@srk.ru.com
Nikolai Yenshin: nyenshin@srk.ru.com
The deposit was identified in the 1960, and explored extensively in the 1960s and ‘70s, with more than 2300 boreholes drilled and 52km of underground exploration workings completed.
The entire Yuzhnaya mineralized zone is located within an old Precambrian fault zone, though the rocks inside the zone were altered and deformed during several progressive tectonic events, which resulted in structural reactivation. Gold-uranium and molybdenum-uranium mineralization is associated with alkaline dikes displaying hydrothermal-metasomatic alteration. The principal uranium mineral is brannerite, (U4+,Ca)(Ti,Fe3+)2O6, which requires more aggressive leaching than most uranium minerals, so, with the development of the Priagunsky deposit, Elkon was not developed.
Atomredmetzoloto (ARMZ), the Russian state uranium mining company, engaged SRK to re-evaluate the deposit and to develop a plan that would meet the requirements of international funding and investment. Knowing that the need for narrow-vein underground mining methods and expensive processing methods would challenge the project economics, SRK aimed to develop a plan that could bring to bear the potential economies of scale and the fact that ore-sorting had been demonstrated to be effective.
SRK created a computerized geological model using the Soviet geological interpretations and borehole data. The model was used to determine the natural rate for different mining options and to identify the impact of different cut-off grades on resources. Taking into account the morphology of the deposit defined by the underground workings and the rock strength data, SRK concluded that a long-hole, open-stoping mining variant, combined with unconsolidated back-filling with development waste, is likely to be the most appropriate solution.
SRK drew heavily on the existing test-work to recommend a base case of pressurised acid leaching for the initial project feasibility analysis and identified a number of additional tests, which will be completed during the summer of 2009, to assess whether the flow sheet can be optimized.
With all of the data in Russian and often available only as hard copies, SRK created a team of Russian and UK employees and associates and worked closely with the client’s own specialists and Russian design institutes to update the options and to re-engineer the operation to significantly reduce the overall costs-per-pound of U3O8 from previous studies. The studies are ongoing with further data collection and test-work scheduled for 2009 and a Feasibility Study to begin in September.
David Pearce: dpearce@srk.ru.com
Nikolai Yenshin: nyenshin@srk.ru.com
|
You can download a PDF of the entire |
PDF A4
|
PDF Letter
|
|
|
|
Our newsletters focus on specific areas of interest to earth resource professionals and clients. Each is available as an Adobe Acrobat PDF file. If you don't already have Adobe's PDF reader, you can download it free.
- Mine Water Management
- Our perspective
- Drainage measures for ensuring the stability of the proposed cutback at Ok Tedi mine
- Designing field programs to maximise the capture of groundwater data
- Changing climate affects mine planning in South Africa
- Managing salt levels in mine water
- Water control evaluation for an iron ore project in Australia
- Collecting 3D data for dewatering of an underground uranium mine in Canada
- Hydrogeologic challenges for data collection in the field
- Impact of quarry deepening on local groundwater users
- Applying numerical groundwater modelling for mine dewatering projects around the world
- Early stage hydrogeological assessments in Central and West Africa
- Inflow water quality - Hope Bay, Nunavut
- Surface water management in the jungle of Brazil
- Mine water supply in the Middle East
- Water and chemical load balance for an underground mine in New Mexico
- Water management for closure, Nevada
- Source water protection planning
- Integrated geotechnical-hydrogeological field investigations in Sweden
- In-pit mine water control at the Grib mine in Russia
- Acid and metalliferous drainage
- Water-related environmental studies for a coal mine project in Chilean Patagonia
- Water supply: an increasing challenge in Chilean mining
- Mine water management with GoldSim in Indonesia
- Stormwater control on mines
- Managing sulfate impacts on water quality
- Integrated mine water management
- Facility Closure
- Mine and facility closure trends
- Closure of Mining Pond B at Richards Bay Minerals, South Africa
- What goes up…
- From abandoned site to community asset
- Closure north of 66°
- Land rehabilitation requirements and practices in Russia
- Using ecological risk assessment to establish closure criteria
- Rehabilitation and construction issues for Silvermines, Ireland
- A risk-based approach to tailings facility closure
- San Manuel, Arizona: from mining to reclamation
- Mine closure planning in the Chinese mining industry
- Demolition costing
- Mine closure regulation in Turkey
- Capital expenditure to reduce long term closure liability
- Reducing economic impacts from interim closure
- Soil covers for cold region mine closures
- How did the International Cyanide Code get started?
- Closure planning to comply with the International Cyanide Code
- Engineering solution to save Pacific salmon in the Tsolum River
- Using abandoned mines as field laboratories
- The Environmental Management Plan and closure planning
- Closure cost confusion
- Rocks & Slope Stability
- International slope stability research
- Geotechnical characterisation
- Risk aware!!!
- 3D modelling structurally controlled weak rock masses using blockiness
- Estimating rock mass strength
- Itabirite iron ore bodies: Generic geotechnical models
- Safe and rapid development for major underground mines: Trends for the future
- Mining challenges in permafrost environments
- Shea Creek uranium project
- Integrating structural geology and geotechnics, Los Caracoles Dam
- Use of photogrammetric mapping techniques for slope stability
- Assessing geotechnical management using the Ground Blockiness Index (GBI)
- UDEC modelling
- Antamina geological modelling, Peru
- Koidu vertical pit, Sierra Leone
- Numerical analyses for evaluating pit wall and underground stability at Ok Tedi
- Blasting program optimises pit slope performance
- Economic success in underground soft rock mining
- Probabilistic stability analysis for pit slope optimisation at Jwaneng diamond mine, Botswana
- Geotechnical design considerations for mine shafts
- Geotechnical investigation for Kwatebala copper open pit, DRC
- Auditing the ground control management plan
- Rapid characterisation of slope instability using LiDAR
- Slope stability – fundamental concepts
- Weathered rock masses
- Slope design in challenging conditions at El Teniente, Chile
- Integrating structural geology and geotechnics at Venetia diamond mine
- Tailings, HL & Waste
- Anglo Platinum, Mogalakwena
- Challenges of tailings disposal in Russia and CIS countries
- Esperanza thickened tailings project
- Seepage control at the Colomac tailing containment area
- SRK leads investigation of very coarse granular materials
- Constructing water balance models using GoldSim™
- Solutions to reduce infiltration
- Penstock decant system for large tailings dams
- Numerical modelling of mineral sands
- Giroux Wash tailings impoundment
- Long term stockpiling of copper ore at Batu Hijau Mine
- Process pond modifications to mitigate groundwater elevation increase
- Tailings storage facility expansion
- Solid waste landfills
- Experience gained from tailings dam audits
- Synthetic liner pipe penetration
- New tailings impoundment feasibility design in Senegal
- Benefits of designing for closure in Nevada
- Mining Project Evaluations
- Santa Rita project financing
- Due diligence study on a complex mining operation in Southern Africa
- Mining project evaluation in Brazil
- Environment and closure due diligence
- Palladon’s Iron Mountain project, Utah
- Technical review of a polymetallic project in East Africa
- A geological risk approach to valuing early-stage exploration projects
- Trekkopje
- Partnering with Polymetal: from IPOs to Compliance Audits for ongoing reporting
- Project evaluation course
- Due diligence in coal – do SRK clients get good value for their money?
- Re-evaluation of the base and precious metal potential south of the Kalimantan Arc
- Red Mountain gold project located in British Columbia, Canada
- El Chanate gold project, Mexico
- Independent review of world-wide exploration portfolio
- Marwa Wahau coal project–preliminary feasibility study
- Talvivaara
- SRK involvement
- Capstone Mining Corp’s Minto Mine
- Taking a holistic view in mining reviews and audits
- Growing up with a gold mine – SRK’s multi-level project support at Hycroft
- Site visit could be critical for identifying the potential fatal flaws
- Evaluating CIS projects
- Sino Gold
- Geology beyond the resource
- Kinsevere Copper Project: due diligence in the DRC
- Social Assessment, Engagement and Advice
- Big five - Tough social issues in mining
- Consultation towards a social license
- Strategies large-scale mining operations may employ in dealing with artisanal mining
- Value added through understanding the local social issues
- Tracking local skills in support of a commitment to employ locally
- Calculating resettlement costs
- The U.S. National Environmental Policy Act and Native Americans
- Stakeholder engagement: A key ingredient for project success
- Community input into Red Dog mine closure plan
- Recent SRK experiences with stakeholder engagement processes
- Stakeholders strengthen pipeline EIA
- SRK adds socio-economic value to project investments
- UK partners building skills in South African water sector
- Building early community relationships
- Enhanced social impact management
- Consultation for a major Bauxite project in Suriname, South America
- Environmental Process
- Integrating Environmental Assessment into Project Development Studies
- Challenges of Merging International and Local Requirements in Russia
- ESIAs for Marine Works
- Process for Implementing Environmental Management Systems in Chile
- SRK on the Leading Edge of Biodiversity
- Case Study from the Land Use Planning Sector, in Nelson Mandela Bay, South Africa
- Application of GIS in the EIA Process
- ESIA and Risk Assessment
- Assessing GHGs and Global Climate Change in EIAs
- Environmental and Safety Management Systems
- Influencing Sustainable Development Policy and Strategy in South Africa
- Suriname River Dredging Project
- Key International Initiatives Influencing Approaches to ESIA
- Promoting Compliance in Non-Compliant Markets – A Chinese Perspective
- Corporate Sustainability in a Carbon-Constrained Economy
- Focus on Uranium
- Trekkopje Definitive Feasibility Study
- Trekkopje Client Focus
- The Napperby Project in Australia
- Gamma Probe eU Data QA-QC Procedures
- Mineralogy Matters
- Grass Roots Uranium Exploration in Argentina
- Developing Uranium Processing Expertise
- Underground Uranium Scoping Study
- Uranium Exploration: the SRK Exploration Perspective
- In-Situ Recovery
- Institutional Controls on Radioactive Mine Wastes
- SOMAIR Uranium Mine Heap Leach Pad
- Pele Mountain Resources at the Elliot Lake Project
- Using JORC and CIM Guidelines for Uranium Resource Estimation
- Mineral Processing Overview
- Re-engineering the Elkon Deposit
- Characterizing the Long-term Stability and Porewater Quality of Uranium Mine Tailings
- Letlhakane Uranium Project, Botswana
- Kuriskova Uranium Project, Slovakia
- Focus on Coal
- Added Value to an Indonesian Client
- Exploration and GIS
- Griffin Coal – Geological Modeling and Resource Estimation
- Caledon’s Revolutionary Cook Colliery
- Coal Mine Dewatering
- Greenfields Coal Exploration in Southern Africa
- The Coal Team in South Africa
- Mining Prefeasibility Study for Morupule Power Station, Botswana
- Mine Planning Software in the Coal Sector
- Using Magnetic and Gravity Data in Basin and Coal-related Geology Studies
- Enterprise Risk Management at Work
- Bringing Coal Basins into Focus
- Relating Resource and Reserve Assessments to International Code Standards
- Managing Risks to Safety, Health, Environment and Sustainable Development Effectively
- Assisting an Emerging Coal Producer in Colombia
- The Russian Coal Industry
- Focus on Geology
- SRK Structural Interpretation Assists Glencar’s Gold Discovery in Mali
- Mapping and Sampling Massive Sulfide Deposits on the Seafloor
- Probabilistic Targeting for Mesothermal Gold Mineralisation
- The Role of Remobilisation in the Formation of Nickel Sulfide Orebodies
- 3D Structural Mapping of Gold Continuity, Venezuela
- SRK’s Involvement in the DRC
- SRK Structural Modeling of the Kumtor Gold Deposit
- 3D Modeling of Structural Domains in Western Africa for Gold Fields
- Importance of Kimberlite Pipe Geometry and Kimberlite Emplacement Model
- JORC and the Chinese Resource Classification System – An SRK View
- Optimising Risk Assessment in Coal and Energy-rich Sedimentary Basins
- SRK Exploration Services – Optimistic Beginnings
- Dar es Salaam Office
- Significance of Structural Architecture in Controlling Mineralisation
- Valuation of Exploration Properties
- 3D Visualisation Techniques: New Advances and Applications
- Structural Controls on Kimberlite Geometry and Emplacement
- Building Geological Expertise for Clients in Chile
- Generating 4D Geological Maps from Regional Geophysics
- Independent Technical Reports: Adding Value
- SRK’s New Office in Kolkata
- Optimising Field Investigations
- 3D Structural Geology Modeling, Peru
- Waste Geochemistry
- Are your environmental data defensible?
- Improve reliability of post-closure water quality predictions
- New porphyry copper mine approval
- South America: Offices bring full power of SRK to their clients’ door
- Solving mining challenges in Africa & the Middle East
- In Memoriam: Ingrid Rozas Valenzuela
- The United Kingdom has thousands of abandoned metal mines
- Selective handling of wastes can reduce future treatment costs
- SRK expands its geochemical services in Australia
- SRK 30th Anniversary